Concept
Rights Implied by Necessity
Creation by Necessity
Rights Implied by Necessity
Once a division of land triggers an implied servitude, two questions remain: what the servitude contains and how long it lasts. Restatement (Third) of Property: Servitudes § 2.15 answers the first. It implies a servitude granting or reserving “rights necessary to reasonable enjoyment of the land,” unless the language or circumstances of the conveyance clearly show that the parties meant the land to go without them.1 Two phrases carry the weight. Necessary confines the implication to what the land cannot be used without, so a right that would make the parcel pleasanter or more profitable falls outside it. Reasonable enjoyment sets the measure at ordinary use of the particular land: more than the bare ability to set foot on it, less than every advantage an owner could want.
That measure sorts the claims a landlocked owner might make. Passage across the burdened land to a public road comes first, because the land cannot be used without it. Services that must travel overland to the parcel, such as electric and telephone lines, follow by the same reasoning, because a house or business that cannot receive them is not reasonably enjoyed. Amenities such as light and air improve land without being needed to use it, and they fall on the other side of the line. The first subsection below sorts claims this way, beginning with access.
Necessity also measures the easement itself. The need that justifies creating the right fixes how far it reaches and when it ends. Earlier sections showed the policy rationale sizing the easement to reasonable enjoyment of the dominant land, and showed the way ending when the owner acquires another route to a public road as of right. The second subsection takes up scope and duration; the fuller law of easement scope, location, and termination belongs elsewhere, so the treatment here stays tied to necessity. A claimant who asks for more than the land needs, or who keeps asserting a way after the need has gone, asks for something the doctrine’s own reason does not support.
Access and Utilities
A way of necessity supplies, at its core, ingress and egress: the right to enter the parcel from a public road and to leave it again. Section 2.15 explains why. It implies only rights “necessary to reasonable enjoyment of the land,” and a parcel that no one can enter or leave cannot be enjoyed at all.2 The doctrine’s history points the same way. Courts have used the way of necessity to keep land productive, and because the grantee of landlocked land had no common law right to cross the land of third parties, a way across the grantor’s land was the only route out.3
Section 2.15 does not stop at passage. Its comment traces how the list of necessary rights has grown: until recently, access for foot and vehicular traffic tended to be the only rights regarded as necessary for enjoying a surface estate, but the increasing dependence on electricity and telephone service delivered through overland cables justifies recognizing implied servitudes by necessity for those purposes.4 In Berge v. State, the Vermont Supreme Court quoted that passage while holding that water access, standing alone, generally does not defeat a claim of necessity. The court added that courts should not freeze the common law so that some landowners can have electricity and others cannot.5 Because Berge turned on water access, the remark about electricity signals a direction and decides no utility claim.
The reasoning that justified implying a road also justifies implying wires. Necessity measures what land needs in order to be used, and that depends on how land is used in the period: what is necessary depends on the nature and location of the property and may change over time.6 Water access shows the drift. Access by water, while adequate once, is generally not sufficient to make reasonably effective use of property today, and land access will almost always be necessary even when water access is available.7 Utilities follow the same drift. A farm once needed only a road; a house without electric and telephone service is often unfit to occupy now, so a conveyance that cut off the only practical route for the lines would take from the parcel something it cannot do without.
Implication of this kind reaches beyond residential wires. In Kysar v. Amoco Production Co., the New Mexico Supreme Court held that a mineral lessee’s implied surface right of reasonable ingress and egress to reach a well extends across lease boundaries within a pooled production unit, to the surface of the entire unit, wherever production takes place.8 The court called the fiction on which Amoco relied not dispositive and treated it as illustrating the public policy that supports recognizing an implied easement.9 Kysar shows implied rights following the purpose of the grant: a mineral lease carries the surface access that reaching a well requires. That tie to purpose also limits what courts will imply, as the next cases show.
Not every court reads the implied way so generously. In Rowell v. Turnage, a developer who held a private way across a neighbor’s land sought to run utility lines along it, and the chancellor held that a private way of necessity for ingress and egress is a right of passage and not an easement for water, sewage, or electric lines.10 The way in Rowell rested partly on a deed and partly on a private-way statute, and the decision preceded the Restatement comment, so it is an imperfect test of implied necessity. It still shows the narrower view, under which a claimant who wants utility lines must argue for the extension the comment supports.
At the other end of the range stand rights that improve a parcel without being needed to use it. Courts have generally denied easements of necessity for light and air, usually reasoning that such an easement can arise only by grant.11 The reason follows from what necessity measures. A parcel can be occupied and built on without a guaranteed flow of light and air across a neighbor’s land, so the conveyance took nothing the parcel cannot do without. A buyer who wants those rights can bargain for them in the deed, and implying them would restrict how the neighbor may build for a benefit the buyer could have priced at the time of purchase.
The breadth of § 2.15’s wording does not make every useful right necessary, and Wood v. Neuman shows the standard doing its work. The owners of a townhouse argued under § 2.15 that they needed a right to enter a neighbor’s garden and patio to maintain and repair the exterior west wall of their house, because the work required more than eight inches of exterior clearance.12 The trial judge found the evidence insufficient to establish strict or absolute necessity. The claimants’ expert, who knew of no other way to do the work, was not compelling; the need for an easement in place of arrangements with the neighbors arose from the parties’ simple inability to get along; and no repairs were currently needed.13 The D.C. Court of Appeals affirmed. It relied on the finding that no continuing necessity was shown and on authority that an implied easement arises only where strictly necessary to the enjoyment of the dominant estate, and it deferred to the findings because they were not clearly erroneous.14
The court did not decide whether a maintenance right of that kind could ever be implied; it rested on the necessity findings. The case therefore shows that a right outside the road-and-wires core must still clear the jurisdiction’s necessity standard, and the facts that defeated this claim were facts about need. The buyer in the utility hypothetical has no route to electric service except across the seller’s land and no negotiated alternative. The townhouse owners could still seek arrangements with their neighbors and had no repair pending, so the right they sought remained a convenience.
Scope and Duration
The same need that creates a way of necessity fixes its size and its lifespan. A way of necessity answers one problem, a parcel that cannot be used, so the dominant owner receives enough to use the land and keeps the right only while the problem lasts. The measure is again the “rights necessary to reasonable enjoyment of the land” that § 2.15 implies.18
Most courts size the way to what the dominant land reasonably needs, not to what it needed on the day of severance. Virginia states the majority view this way: a way of necessity “is not limited to such use of the land as was actually made and contemplated at the time of the conveyance, but is a way for any use to which the owner may lawfully put the granted land at any time.”19 The contrast is with an easement implied from prior use, which passes the benefits and burdens that existed at the time of the conveyance and so takes its edge from what the parties were doing.20 A way of necessity preserves the land’s capacity to be used at all. Because the doctrine exists to keep land productive,21 a way frozen at the footpath or wagon track that sufficed at severance would strand the parcel a second time once its owner can lawfully put the land to a use the old route cannot carry.
The Virginia court applied the principle to a coal company in Keen. It upheld a finding that removing and hauling the coal was reasonably necessary to the beneficial use of the dominant estate, even though both parcels were in a state of nature at severance and no roadway was in use.22
Palmer v. R.A. Yancey Lumber Corp. applies the rule to a dispute over width. The servient owner urged a static rule that freezes an easement by necessity at the parameters it had when it arose. The Virginia Supreme Court called that rule the antithesis of the doctrine’s own rules: it would hold a way that began as a footpath, a horse trail, or a wagon road to those limits forever if the servient owner wished, whatever the cost to the useful development of the dominant estate compared with the incremental burden, if any, of an expansion. A way three feet wide in the 1800s, good for hauling one log at a time by horse, would still limit timbering today.23 The court held instead that, under the “reasonable necessity rule,” the width of an existing easement by necessity may be expanded without the servient owner’s consent.24
Other courts reach the same place by reading the original conveyance. The Michigan Court of Appeals inferred in Schumacher that the grantor intended to allow modification of the easement as technology develops, which fits the essence of easements by necessity: allowing individuals reasonable use of their property so long as the use does not unduly burden the servient estate.25 In Montana, Ashby v. Maechling likewise recognizes that when severance predated the general use of motor vehicles and electric power, an easement by necessity may still allow reasonable technological developments, so long as the use does not cause unreasonable damage or interference with the servient owner’s rights.26
Growth has a ceiling on the servient side. Palmer states the limit: modifications for the benefit of the dominant estate must not create unreasonable burdens on the servient estate, so the trial court balances the benefits and burdens to both estates in deciding which modifications, if any, to approve. It took the instruction from Traders, Inc. v. Bartholomew, a Vermont decision directing trial courts to “strive for a balancing of interests in fashioning” an easement by necessity.27 The balance is needed because the servient owner bore the burden by implication, without a word in the deed and without compensation.28 Only the dominant land’s need can justify that burden, so a court weighing both estates can approve a modest widening and still refuse a request that outruns the need.
The first request is the Palmer situation: a need of the dominant land met at small cost to the servient land. The second reaches the ceiling, since the way follows the land’s reasonable needs and a request that far exceeds them loses at the balancing step.
A more cautious line asks what the original parties could have contemplated. In Higbee Fishing Club v. Atlantic City Electric Co., a footpath and not a roadway was the proper scope of the easement, because the parties to the original grant could not have contemplated use of the dominant estate as a clubhouse.29 Both views use the same yardstick, what the land reasonably needs, and they differ over how much weight a later change in use receives. A jurisdiction that follows Palmer lets the way grow with reasonable needs; a more cautious one asks whether the new use is one the original parties could have foreseen.
Location works differently from scope. A way of necessity arises with no route marked on the ground, but once the way has been located it can be moved only with the consent of both owners.30 The traditional rule bars the servient owner from compelling the holder to accept a substitute location, even when the terms of the easement are silent on the point.31
Duration follows from the same purpose. A way of necessity lasts only as long as the necessity that created it.32 The burden on the neighbor was justified only by stranded land. Once the owner holds lawful access, the way no longer secures usability and serves only convenience, and the servient owner, who never agreed to it and was never paid, would carry a permanent encumbrance for a problem that no longer exists. The Texas court reasoned the same way in Alley v. Carleton: the law implies the way solely to secure the enjoyment of property the owner would otherwise lose, so when the necessity ceases the right ceases.33
The event that ends the way is the holder’s acquisition of another lawful route. Once a new road is built or a new way becomes available, the easement ends.34 Some courts have held, however, that a way of necessity survives when a public road is later built adjacent to the formerly landlocked parcel.35 The substitute must be access as of right. In one case the original grantee and his successors had been permitted to cross the land of surrounding strangers, and the court held that permission immaterial: when the strangers denied it, the later owners could rely on the way implied in the original conveyance.36
A related question is whether necessity must be shown again after the way arises. Most states require continued necessity for implied easements, but Rhode Island measures necessity as of severance and requires no showing of current necessity.37
The limit applies to the implied way and not to easements created by other means. Wisconsin treats a way of necessity as a temporary right that lasts only while the necessity exists, but the rule that the right ceases with necessity has no application to ways acquired by express grant or by prescription.38 In AKG Real Estate, LLC v. Kosterman, the court concluded that an easement granted by express instrument in 1961 would remain in force even if the servient owner provided alternate public-road access, because an express easement continues whether or not the dominant estate still needs it.39 The label on the easement therefore decides what a new road does: it ends a way of necessity, and it would leave an express easement over the same route in place.