Concept
The Majority Test
Vested rights
The Majority Test
Most states apply the vested rights principle in its strictest form. The general rule gives an owner a vested right to complete a project when good-faith reliance on a permit or existing zoning has produced substantial expenditures or a change of position, and the jurisdictions that demand a valid permit and substantial construction apply that rule most severely.1 Under this majority common-law approach, a developer escapes a new ordinance only by proving three things: a valid governmental permit, substantial expenditures or obligations incurred under it, and good-faith reliance on the permit in making them.2 When all three are present, the new law cannot reach the project. When any one is missing, the newest law governs.
The requirements pair a governmental act with private reliance, which is why vesting arrives later in these states than many owners expect. A permit with nothing spent under it leaves the owner with little to lose, so the legislature's freedom to amend zoning should prevail. Spending without a permit rests on no commitment by the government, only on the owner's hope that the law would hold still. Requiring both prevents an owner from locking in the old rules by buying land, commissioning plans, or talking with officials. The owner must first obtain the approval and then put real resources behind it before the law changes. The race between owner and legislature survives under this approach, but its finish line is a permit backed by commitments, not a plan.
Each requirement raises its own questions, and this section takes them in the order a court would. Courts first ask whether the owner holds a valid permit, because without an approval there is nothing to rely on. They then ask how much spending or construction is substantial, how to separate preparation from commitment, whether the owner acted in good faith and without disqualifying notice, and how far the resulting right extends.
Valid Government Permit
Under the majority common-law rule, the developer must show substantial expenditures, obligations, or harm incurred in good-faith reliance on a validly issued building permit.3 The general rule allows reliance on a permit or on existing zoning to support a claim, and the majority resolves that choice in favor of the permit.4 Most courts speak more broadly of some governmental permission to proceed, which usually means a building permit, and that permission fixes the date after which later changes in land use regulations may not apply to the project.5 The first question in a vesting problem is therefore whether the owner holds an affirmative approval from the government. Heavy spending, ownership of the land, and favorable zoning at the time of purchase do not substitute for one.
The leading illustration is Avco Community Developers, Inc. v. South Coast Regional Commission. Avco owned some 8,000 acres on which it planned a community, and it developed in phases. It held county permits to subdivide and grade 74 acres and was installing storm drains, streets, and other utilities, having spent or incurred liabilities of $2.7 million, when the state's coastal act took effect and required a permit from the coastal commission. Avco claimed a vested right to proceed without the new permit. The court rejected the claim because no final building permit had issued from the county by the date the new requirement became effective.6 The size of the outlay carried no weight on its own. What was missing was the final county approval that would have turned Avco's spending into reliance on a governmental commitment.
Vesting rests on reliance, and reliance deserves protection when the owner has acted on something the government itself did. A permit is that act. It records an official decision that the project may go forward, so spending under it traces to the government and not to the owner's private speculation. Without an approval, even large expenditures reflect the owner's own bet on how a discretionary process will turn out, and the government has made no commitment that the bet will pay. The California court added a structural concern: recognizing vesting on those facts would take away the government's discretion to control land development policy.7 The permit also gives everyone a date after which the old rules govern the project.
Owners sometimes offer ownership under favorable zoning in place of a permit, and the offer fails in most states because there is no right to a development permit based on the zoning that existed when the developer acquired the land.8 A buyer who pays a price that assumes the existing classification will last bears the risk that a downzoning will cut the land's value. The purchase price also fails as spending. Courts generally leave it out of the substantial-expenditure calculation, since counting it would let anyone freeze the zoning simply by buying the parcel.9 Acquisition costs and pre-application spending are therefore the developer's own risk until a permit issues.
A stem that reports heavy spending followed by a rezoning is asking, first, whether the spending rested on an approval.
Majority courts do not let the permit requirement turn on labels, because its purpose is an official commitment and several kinds of approval supply one. Some courts vest rights at the government's final discretionary act, so a special permit has been held to vest rights before any building permit issued, and approval of a site plan has likewise been found sufficient.10 Issuance of a special or conditional use permit creates vested property rights in the owner, particularly when the owner relies on it by spending money, and the permit ordinarily cannot be rescinded except as its own terms allow.11 Modern projects often pass through these approvals long before a building permit issues, and once the government has made its discretionary decision, the concern that drove Avco, preserving that discretion, is no longer at stake. How far the flexibility runs is unsettled. Avco itself conceded that something less than a final building permit might sometimes vest rights, but it gave no such relief to the developer before it.12
A minority of states goes further and lets rights vest without any permit. Oregon is the usual example: in Friends of Yamhill County, Inc. v. Board of Commissioners of Yamhill County, the court recognized that developers can vest their rights by incurring substantial costs in reasonable reliance on existing law even without a building permit.13 Virginia's statute sits between the two approaches, asking for extensive obligations or substantial expenditure in good-faith reliance on a significant affirmative governmental act, such as a rezoning or site plan approval.14 Those jurisdictions still scrutinize the spending closely, as the next section shows, so in them the reliance showing does all the work that the permit does elsewhere.
A permit is necessary but not sufficient. In most states a building permit standing alone does not vest a right to continue, and the authorities may revoke it if the zoning classification changes before the developer has incurred substantial expenditures under it.15 The permit supplies the governmental act; the expenditures supply the harm that makes it inequitable to apply the new law. In Dawe v. City of Scottsdale the owner recorded an approved subdivision plat before a new zoning law made the lots substandard, but the land stayed vacant and unimproved, and the Arizona Supreme Court rejected the claim of a vested right.16 Dawe and Avco mark the two halves of the test from opposite directions. Avco had substantial spending without a final permit, and Dawe had an approval with nothing spent in reliance on it.
Two cautions remain. First, a permit issued after a referendum on the underlying zoning law has begun may be unsafe to rely on in some jurisdictions. The Hawaii Supreme Court said in County of Kauai v. Pacific Standard Life Insurance Co. that a referendum begun after final discretionary action leaves a vested right intact, while permits issued once the process is under way are not safe to rely on, because the vote itself becomes the final discretionary act.17 Second, the permit must be validly issued, and the consequences of a permit the government issued in error are taken up later in this chapter under illegally issued permits.18
Measuring Substantial Reliance
The general rule asks whether the owner made substantial expenditures or otherwise changed position in good-faith reliance on a permit or existing zoning, and the word “substantial” arrives with no number attached.20 The Oregon Supreme Court gave it the most influential content in Clackamas County v. Holmes, which held that a landowner must show either that the commencement of the construction was substantial or that substantial costs toward completion of the job were incurred.21 The two alternatives give an owner two routes. An owner who has raised much of the structure can vest on that basis, and an owner who has built little can still vest by showing heavy commitments toward finishing. The formulation, though, only narrows the inquiry. It repeats “substantial” without saying how much is enough, and the rest of Holmes works out an answer.22
A ratio is the obvious way to turn “substantial” into a number: compare what the owner has spent with the project's total cost, and call the spending substantial once the fraction is large enough. A New York court took that path in Town of Hempstead v. Lynne, looking solely to the ratio of expenses incurred to total project cost and counting only expenses made exclusively for the proposed development.23 The attraction is plain, since a ratio is easy to compute and gives both sides a figure to argue over. The trouble is that one number can mislead in both directions. A modest share of a very large budget may still be an enormous commitment, a high share of a small budget may reflect only the first inexpensive steps, and the ratio never says what the money bought. Holmes therefore treated the ratio as one factor, and it departed from the New York approach in three ways. It did not look solely to the ratio. It asked whether the expenditures “have any relation to the completed project or could apply to various other uses of the land” instead of counting only exclusive expenditures. And it made that question one of several factors, instead of subtracting non-exclusive costs from the ratio so that the resulting figure decided everything.24
The factors Holmes added to the ratio are the owner's good faith; whether the owner had notice of proposed zoning or an amendment before starting the improvements; the type of expenditures; the kind of project; its location; and its ultimate cost. The owner's acts must also rise beyond mere contemplated use or preparation.25 Each factor tests whether the spending was a genuine response to the existing zoning. Good faith and notice ask whether the owner spent in reliance on the old law or in the face of a known risk that it would change, a subject taken up in its own subsection below. The type of expenditure asks whether the money relates to the completed project or could serve other uses of the land. Spending fitted to one planned facility loses its value when the old zoning disappears, while spending that any development of the parcel would need shows little commitment to this project. The remaining factors calibrate the rest of the evidence. The kind of project affects how much money must go out before any structure is visible, the location bears on what the owner could reasonably have expected from the surrounding planning, and the ultimate cost shows what a given percentage means in dollars. Together they let a court ask what the doctrine cares about, whether the owner has changed position in a way that would be inequitable to undo.26
Courts outside Oregon measure reliance in several other ways. Many require that a certain amount of money be invested, some adopt the ratio approach to avoid setting an arbitrary figure, some insist that actual construction begin, and many also count other reliance such as contract obligations.27
The facts of Holmes show what a successful record looks like. When the defendants began searching for a site for a new plant, zoning was their first concern, so they hired counsel to investigate it and were told by the county planning department that the land was unzoned and that no long-range planning was under way in the area.28 A sanitation engineer ran waste-disposal surveys that the state sanitary authority approved, and the defendants bought the land on the strength of that zoning information and the soil survey.29 They then drilled an 843-foot well with a 75-horsepower pump and a 50-horsepower booster pump, arranged electrical power and transformers sized for the irrigation system and the processing plant together, and planted Alta fescue grass, chosen on an agronomy expert's advice, to let waste water soak into the soil.30 The court held that these defendants had acquired a vested right to complete construction of the plant. It added that pasturing about 400 head of cattle on the land after the 1966 ordinance did not change the result, because the defendants “had to do something with the ground” after the zone change.31 Run through the factors, the record is strong on each. The owners checked zoning before buying and were told no planning was under way, which answers good faith and notice, and the money went into a well, power service, and planted fields designed around the plant itself, which answers the type of expenditure. Oregon, as noted, vests rights without a building permit. A state that requires one would demand that approval as well and would then measure reliance the same way.32
Stone v. City of Wilton sits at the other end of the line. The Stones bought about six undeveloped acres in June 1979 to build a federally subsidized low-income housing project, a plan that depended on multi-family zoning, and most of the tract was then zoned R-2, multi-family residential.33 They paid for architectural and engineering services to prepare plans and plats, secured a Farmers' Home Administration loan commitment, and filed a preliminary plat. The city denied their building permit application because a rezoning to single-family use was pending, and the council enacted the rezoning in June 1980.34 Their expenditures totaled about $7,900, plus their own time and effort, and the Iowa court rejected their claim of a vested right.35 It measured the record against the standard from Board of Supervisors of Scott County v. Paaske: no definite percentage of total cost establishes vested rights in all cases; the answer depends on the type of project, its location, its ultimate cost, and principally the amount accomplished under conformity; and each case must be decided on its own merits.36 Most states agree with that standard, under which an owner who has invested substantially in good-faith reliance on existing law holds vested rights.37
Holmes itself lists Paaske among its authorities, so the two decisions work from the same approach.38 What separates their outcomes is the content of the spending. In Holmes the money produced a well, power service, and planted fields built around the plant, commitments in the ground that lose their value if the plant cannot be built. In Stone the money produced drawings, plat work, and a loan commitment, the steps an owner takes to ask permission to build, and no construction was under way when the city denied the building permit application. Because Paaske puts its greatest weight on the amount accomplished under conformity, physical commitments of the first kind outweigh paperwork of the second, and no percentage of project cost settles the question for either owner.
Preparation Versus Commitment
Clackamas County v. Holmes, which gave Oregon its multi-factor test, also drew the line this subsection examines. Alongside the expenditure ratio, good faith, notice, and the type of spending, the court required that the landowner's acts “rise beyond mere contemplated use or preparation, such as leveling of land, boring test holes, or preliminary negotiations with contractors or architects.”40 The general rule asks for substantial expenditures or a change of position in good-faith reliance, and the preparation line is how courts decide which of an owner's steps count toward that showing.41 Preparation covers what an owner does to learn whether and how a project can be built, or to ask permission for it. Commitment covers tangible work directed to the proposed use, or binding obligations to pay for it, that would be wasted if the project could not go forward.
The line follows from the harm that vesting exists to prevent. A rezoning hurts an owner most when it strands money spent on one particular project, and least when the owner can redirect what was spent. Leveling serves nearly any building, test holes yield information the owner keeps, and talks with architects or contractors leave behind no improvement and ordinarily no debt. An owner who has done only those things can turn to another permitted use at small cost, so the equities favor the municipality's freedom to amend its zoning. That is why the type-of-expenditure factor asks whether spending relates to the completed project or could serve various other uses of the land.42 A second reason supports the same result. If general-purpose work could vest rights, an owner could freeze the old zoning cheaply by grading a lot or running a road to it, the same objection that keeps the purchase price out of the calculation.43
Two Iowa decisions show the line from opposite sides. In Board of Supervisors of Scott County v. Paaske, an owner holding a county permit to move five houses onto a parcel excavated basements for four of them, placed a septic tank underground for the fifth, laid concrete footings for two basements, contracted for the foundations under all five houses, and stockpiled a substantial amount of building materials before the land was rezoned. The court held that his work was so substantial that he had a vested right to finish the project.44 In Stone v. City of Wilton the owners had a federal loan commitment and an architect and engineer who drew plans and plats, yet the court treated these as only the most preliminary steps toward construction. The plans were not a contractor's working blueprints, no bids were sought, no construction contracts were let, no materials reached the site, and no earthwork began.45 Both owners paid professionals, so professional activity does not separate the cases. Paaske's work sat in the ground and under contract, while the Stones' work existed on paper and in applications. A rezoning that arrives at the paper stage costs the owner far less than one that arrives after the concrete is poured.
Binding contracts sit near the boundary. Many courts count contract obligations as reliance alongside money spent, although some insist that actual construction begin.46 A binding contract earns weight for the same reason physical work does: the owner must pay for performance on this project whether or not the new law lets it proceed, while a bid or a conversation commits the owner to nothing and can be dropped for free. The ultimate measure is the harm that compliance with the new law would cause, which must amount to a “serious loss, rendering the improvements essentially valueless.”47 In Vulcan Materials Co. v. Greenville County Board of Zoning Appeals, a mineral lessee spent nearly two million dollars to locate granite, arranged for the removal of 15 acres of overburden to expose it, and was awaiting a state mine operating permit when the county downzoned the land. The court held that the lessee had moved beyond mere contemplated use and preparation.48 The money spent locating the granite resembles the test holes in the Holmes list, since it produced information. Removing the overburden is different in kind, because it physically altered the land for extraction, and an exposed deposit that may not be quarried is an improvement with almost no value.
A stem that lists a dozen activities is testing whether you can sort them, and the sorting turns on physical change and project specificity, not on the length of the list.
Hogg's claim fails on two counts: most of the work was preliminary, and no permit backs it. Courts state the standard for a use that is not yet operating in three parts: good faith, substantial work toward the actual use, and in most courts a building permit, with mere preliminary matters and general improvements falling short.49 Much of Hogg's activity was preliminary or left the land unchanged, and the road and sewer system could serve other permitted businesses. Only the manure pits were built specifically for a hog farm, and beside a farm of that size they were insubstantial.50 The missing permit counts against Hogg too, because vested rights are often treated as a conclusion that the municipality should be estopped from barring a use it authorized by permit.51 Holmes supplies the comparison from the winning side. Its defendants' 843-foot well, power service sized for the irrigation system and the processing plant together, and deep-rooted grass chosen to absorb waste water were all built around the plant and would have lost their value had the plant been forbidden.52
The first two steps do most of the sorting, since they screen out the leveling, test holes, and negotiations that Holmes names. The third step supplies the equitable reason for the result, because it measures the loss that vesting exists to prevent. The fourth reminds you that even a strong record of work can fail in a state that requires a permit when the work rested on no valid approval.
Good Faith and Notice
The general rule protects an owner whose expenditures or change of position came in good-faith reliance on a permit or existing zoning, so what the owner knew when the money was spent matters as much as the amount.54 Courts applying the majority approach have sorted bad faith into a few recognizable settings. Spending or incurring obligations while aware that an ordinance prohibiting the use is pending and that its adoption is imminent is bad faith. So are acts done in “unseemly haste” just before an ordinance takes effect, and so is misleading the government or relying on a permit the developer knows to be invalid.55 Good faith asks whether the owner was relying on the old law or racing against the new one.
Vesting shields reliance, and an owner who knows the law is about to change has not been misled by it. The old rules were still on the books, but every signal said they would soon be replaced, so a loss from the change is a risk the owner chose to take. The idea resembles the takings principle, developed later in this chapter, that an owner's investment-backed expectations must be reasonable, and good faith plays the same objective-reasonableness role inside the vesting analysis. Publicity during a planning process can itself trigger a race among developers to build, or to secure a vested right to build, before controls they fear are adopted.56 A good-faith limit keeps that race from rewarding every developer who can pour concrete fast enough, because money spent with the change in sight does not count.
The clearest account of how notice affects spending comes from Spindler Realty Corp. v. Monnong, which the California Supreme Court described in Avco and which a dissenting judge later quoted in Elysian Heights Residents Association, Inc. v. City of Los Angeles.57 A builder whose land was zoned for multiple residential use obtained a grading permit and other approvals, graded the site, submitted plans for a high-rise apartment complex, and spent over $300,000. The property was then rezoned to single-family use before the building plans were approved. The court held that the builder had a vested right to complete the grading but not to build the structures the old zoning allowed. One reason was that a grading permit is not a building permit. The other was notice: although the builder had proceeded in good faith for two years in reliance on the zoning and the city's authorizations, it was taking a “calculated risk” in continuing its preparations at least from the time it learned, before grading was complete, that the city was considering rezoning the property.58 The court dated the risk from the moment of notice, so spending before the owner learned of the proposal and spending after it do not stand on equal footing. The builder also lacked a building permit, and its knowledge that rezoning was under consideration made its later outlays a gamble it could not charge to the city.
The dissent in Elysian Heights shows how far a court can push the same reasoning. The developer there obtained a building permit for a forty-five unit project in October 1984, but state law had required the city to bring its zoning into line with its general plan by July 1, 1982, and the plan would have limited the area to fifteen units.59 The dissenting judge argued that the developer was deemed to know that rezoning was required and overdue, so that it was taking a “calculated risk” in building and could not claim a good-faith belief that it was entitled to build forty-five units.60 The opinion is a dissent, so it states one judge's position and not the holding. It still marks a pressure point in the doctrine: whether knowledge of a statutory duty that the city has left unperformed is enough to charge the owner with notice of the coming change.
The harder question is how much knowledge is too much, and the authorities mark the ends of the range more clearly than the middle. At one end, mere knowledge that the municipality might make a change has been held insufficient to defeat vesting.61 A rule that treated every rumor or proposal as bad faith would let a government defeat any vested right by floating ideas it never meant to adopt, and owners would have to freeze every project whenever a council member spoke. At the other end, spending while an ordinance is pending and its adoption is imminent is bad faith. Between the two, courts ask whether the developer reasonably should have anticipated the change in the regulations, and a developer who should have, and proceeded anyway, is generally treated as having acted in bad faith.62 The same idea appears in the formulation that the claimant must have had no good reason to believe the ordinance would be enacted or amended to prohibit the intended use.63 The standard is objective, so an owner's claim of innocence does not control when the circumstances pointed toward a change. The Holmes owners, who asked about zoning before buying and were told that no planning was under way, were found to have acted in good faith.64
Timing can defeat good faith even when the owner has no reason to doubt the project's merit. Acts done in unseemly haste just before an ordinance takes effect have been found to be in bad faith.65 Pennsylvania took a similar view in Penn Township v. Yecko Brothers, where a person who obtained a permit and made a substantial change of position before the law changed could be entitled to proceed, but only upon showing good faith, including that the person did not race to get the permit before a proposed change in the law.66 Haste matters because it shows what the spending responded to. Money rushed out ahead of a deadline answers the approaching ordinance and not the existing zoning, and the reliance rationale supports protection only for the second. The usual evidence of haste is a pace of work that follows the deadline instead of the project's own needs.
Two further settings involve the government rather than the calendar. If the developer misled the government to obtain approval, or acted in reliance on a permit known to be invalid, no rights vest.67 Vesting treats a permit as the government's commitment, and a commitment obtained by misleading the issuing officials, or one the developer knows to be defective, gives the developer no reasonable basis for reliance. A later section takes up the related problem of permits issued illegally or in error.
The last setting arises when someone challenges the permit. If the city or the neighbors appeal, alleging that the permit or the law underlying it is invalid, expenses incurred during the appeal will not be in good faith, and a developer who proceeds during the appeal does so at its own risk because courts can and do order buildings razed.68 The developer then knows that the approval it relies on is contested. Without the limit, a developer could finish construction while the appeal was pending and hand the court a completed building that it would have to either legitimize or order torn down. Money spent before anyone challenges the permit is measured as in any other case, while money spent after the challenge is filed counts for nothing toward vesting. The rule can be harsh, since waiting out an appeal may strain a project's economic viability, and because the time to appeal may not start running until the aggrieved party receives notice, the developer may be left in limbo. Extremely short limitations periods substantially aid the developer.69
The first step does most of the work, because the line between a possible change and a pending, imminent one decides how much of the spending is protected. The last step catches cases in which notice came from a challenge to the permit and not from the legislative calendar. A record can also fail without any misconduct. If the money spent before notice was insubstantial, the owner has nothing protected to build on, whatever the later spending shows.
Scope of the Vested Right
Under the general rule, a landowner acquires a vested right to complete a use or development when, in good-faith reliance on a permit or existing zoning, the owner has made substantial expenditures or otherwise changed position so that taking the right away would be inequitable.71 Each half of that standard has an edge, because a permit approves something specific and the owner's spending and construction commit the owner to something specific. The protected project is the one on which the approval and the reliance overlap, and the right extends no further. The reason lies in the harm vesting prevents, which is a loss caused by reliance. For any part of a master plan that has no approval behind it and no commitment of resources, the owner has nothing to lose, so that part falls back under the default rule that the newest law governs. If one building's permit worked as a license for the whole plan, an owner could freeze the old zoning over years of future phases on the strength of a single foundation, and the municipality would lose the freedom to amend its zoning that vesting was never meant to remove.
A common error is to treat the first permit as covering everything the developer eventually hopes to build. A developer planned a condominium project of 14 buildings and 108 units on unzoned land, completed market research and financial studies, prepared drainage, grading, landscaping, and sewer plans, platted the tract, and cleared a portion of the land. The developer then obtained a building permit for one five-unit building and began its piers and foundations. A month later the town zoned the land single-family, announced that it would issue no further permits, and said it would revoke the one already issued.72 The developer has no vested right in the 14 buildings and 108 units, because there were no permits for thirteen of the buildings and no money spent to develop them substantially, and starting construction on the first building did not vest the entire project.73 The developer can, however, finish the first building. The developer acted in good faith, held a building permit, and had installed piers and foundations that substantially advanced the use, so the town is estopped, meaning barred by fairness from going back on what it authorized, from revoking that permit.74 The studies, plans, platting, and clearing, however extensive, resemble the preparation work that the preceding subsection placed on the weak side of the line, and none of it supplied the missing approval for the other thirteen buildings.
A developer who has built infrastructure for a whole tract stands in a different position. In Telimar Homes, Inc. v. Miller, a developer acquired a tract to be subdivided in four sections, and the town approved the map of the first section, which provided for quarter-acre lots. Roads were built, model homes were constructed, and a water company was organized. The map of the second section was also approved, but the town then amended its zoning ordinance to require half-acre minimum lots and disapproved the maps for the third and fourth sections.75 The court held that the developer could proceed on all four sections without regard to the amendment. The water system, roads, drainage system, model house construction, and advertising had been laid out for the benefit of all four sections as a single overall tract and would have been planned on an entirely different basis if each section had been developed separately. In addition, substantial construction had begun and substantial money had been spent in partial development of sections three and four as well as sections one and two.76 In Elsinore Property Owners Ass'n v. Morwand Homes, a New York court reached a similar result for a developer that had filed a plat and a performance bond, built some homes, and conveyed the unsold lots to a successor. The court held that a later amendment increasing the minimum lot area could not apply, because the developer and its successor had a vested right to complete the development as planned.77
The condominium example and Telimar fit together because both measure scope by what the owner's commitments were built for. In the condominium example, everything physically committed served one building, and the town's permit approved one building. In Telimar, the water system and roads would have been designed differently had the sections stood alone, so the money was already committed to the whole, and the court also found work under way in the later sections. Work that would be laid out the same way for a single building or a single section shows reliance on that unit alone, while work that would be wasted if the project were broken up shows reliance on the whole project. The question to put to any infrastructure claim is therefore whether the work was designed for the entire development and would lose its value if the development were divided.
A permit also vests only the work it authorizes. In Spindler Realty Corp. v. Monnong, as the California Supreme Court described it in Avco, a builder whose land was zoned for multiple residential use obtained a grading permit that did not refer to the number, size, or type of buildings. The builder graded the property, submitted plans for a high-rise apartment complex, and spent over $300,000 before the land was rezoned to single-family use and before the building plans were approved.78 The court held that the builder had a vested right to complete the grading but no vested right to build the structures the old zoning allowed.79 A grading permit is not the equivalent of a building permit, even when the city's ordinances require a grading permit before a building permit can issue, and the builder knew it would need a building permit to construct buildings.80 The government had committed itself to grading and nothing more, so the builder's reliance on that commitment reached only the grading. The same logic runs through the five-unit building, where a building permit for one structure supports a right to finish that structure. Notice was a separate ground in Spindler, and it belongs to the good-faith analysis above.
Two further points apply to a right that has vested, and neither adds an element to the test. An owner whose permit and construction entitle the owner to proceed may still be held obligated to pursue the remaining construction diligently in order to keep the right.81 The duty follows from the reliance rationale, because a right that rests on a project under way gives the owner no ground to hold the old zoning in place indefinitely while the site sits idle. The right may also pass to a successor. Elsinore recognized it in the developer's successor, and Colorado provides by statute that vested rights attach to the property and run with the land to subsequent owners so long as the project does not offend the public health, safety and welfare, which lets a buyer or lender rely on the original owner's approvals.82