Concept
Construction Loan Problems
Future advance mortgages
Construction Loan Problems
A construction lender funds its loan in stages. The mortgage is signed and recorded against land that holds a half-built structure or none at all, and the money reaches the borrower only as the work advances. That schedule makes construction lending the setting where the future advance rules are tested hardest. A future advance mortgage secures the initial loan and later advances alike, and the validity and priority of those advances depend on state statute and on the terms of the mortgage.1 Some jurisdictions ask whether each advance was obligatory or optional and whether the total stays within a stated maximum; others give priority only to advances made before the lender has notice of an intervening lien.2
During the months of disbursement, other people acquire interests in the same land: a second lender records a mortgage, a contractor goes unpaid, a supplier files a lien. Each draw invites the questions taught earlier. Was the lender bound to make the advance? Did the advance come before the intervening interest attached? Did the lender know of that interest when it funded? One project multiplies both the advances and the claimants who can challenge them.
Two problems recur. A default midway through the work leaves the lender deciding whether to keep funding a building it hopes to see finished. And mechanic's lienors, whom state statutes protect, compete with the lender's advances. Both problems turn on the classification of advances taught above, and state statute can change either result.
Lender's Post-Default Dilemma
Construction lenders have severely criticized the obligatory/optional distinction because applying it to a construction loan mortgage often produces inequitable results.3 The complaint is clearest when the project is traced in order: the loan, the progress of the work, a default, the lender's choice, and the priority consequences of that choice.
The lender begins by signing and recording its mortgage and committing to fund the loan as construction progresses. Because it is obligated to make those advances, a project completed according to the plans leaves it with first-lien priority for every advance.4 Trouble starts when the developer defaults. Construction loan documents typically give the lender the right to stop advancing funds upon the mortgagor's default.5 That right changes the character of every later dollar. Before default, the lender must fund whenever the loan's conditions are met, so its advances are obligatory. After default, the lender is free to refuse, so any advance it chooses to make is optional and exposed to loss of priority against intervening liens.6
The lender now faces a choice that costs something on each side. If it stops funding, the incomplete project probably will not be worth enough even to cover the lien for the obligatory advances it made before the default.7 If it keeps funding, its post-default advances are optional and may rank behind liens that attach in the meantime. Unpaid contractors, suppliers, and later lenders are the typical intervening claimants on a stalled project, and a lender that keeps funding will often know of their claims. Knowledge of an intervening lien is what postpones an optional advance under the notice rules taught above.
The criticism rests on who benefits from the lender's money. Completing the project enhances the value of the security for the construction lender and for any intervening lienor alike.8 Each post-default dollar that finishes the building raises the value of the land on which the lienor's own lien sits, yet the optional label can place that dollar behind the lienor. Stopping would leave every claimant with less.
Most courts reach exactly that ranking. They apply the rule mechanically and conclude that advances made after default are optional.9 A few courts, however, apparently will award the construction lender complete lien priority if it makes post-default advances in good faith and under economic compulsion.10 The two phrases fit a lender that advances to finish the building and protect an investment already at risk, with little real choice because stopping would leave its collateral inadequate. A court of that kind would rank the $150,000 in the hypothetical with the original mortgage, because the lender's money completed the building that secures everyone's claim.
Legislation reaches a similar result more predictably. In states whose statutes eliminate the distinction between obligatory and optional advances, the lien of every future advance dates from the execution of the covered mortgage, even if the mortgagee advances with notice of an intervening encumbrance.11 Finishing the building then costs the lender nothing in rank. These statutes generally require the mortgage to state the total amount secured, so the lender's protection depends on that figure appearing in the recorded instrument.12 If the mortgage in the hypothetical stated a $600,000 total, the $150,000 would rank from the recording date.
The drafting of the loan documents raises a related problem. An advance is optional whenever the mortgagee has discretion to make it, and many mortgages for optional future advances, sometimes called open-end mortgages, leave the choice with the mortgagee.13 A construction lender has valid reasons to keep some control over the advances, but too much control may cost it priority.14 If the developer strays from the plans and specifications, the permanent lender may refuse to take out the construction loan, which forces the construction lender either to foreclose or to become the permanent lender itself. The construction lender should therefore monitor the work for consistency with the plans.15
The wording of the conditions draws the line. Conditions tied to the borrower's compliance with procedures leave the advances obligatory, as in Schalmo Builders, Inc. v. Malz, and so does the lender's waiver of a condition it imposed for its own benefit, as in Home Lumber, discussed below.16 A condition tied to the lender's own resources falls on the other side. In Kraus-Anderson Construction Co. v. Superior Vista LLC, the lender was obligated to make advances under the plans, but its obligation was conditioned on its ability to obtain the necessary funds, and the court concluded the advances were optional.17 A lender that ties its conditions to what the borrower does and to the progress of the work keeps its obligatory status while the borrower performs. The post-default dilemma arises only after performance fails. The outcome then depends on whether the jurisdiction applies the rule mechanically, credits good-faith advances made under economic compulsion, or has a statute that ends the distinction.
Mechanic's Liens and Advances
Priority problems arise frequently between mechanic's lienors and mortgagees, particularly construction mortgage lenders.19 A mechanic's lien gives an unpaid contractor or supplier a claim against the property it improved, and each state's statute decides where that claim ranks. The statutes are far from uniform on the subject.20 The contest between lienor and lender has two layers. The first asks where the lien ranks against the mortgage itself. The second asks, once the lender has recorded early enough, whether its later advances keep the mortgage's rank.
In states where mechanic's liens relate back to the start of construction, the statutes anchor that date to something visible on the site. Minnesota's lien attaches when the first item of material or labor is furnished, but visible staking, engineering, land surveying, and soil testing do not count as the actual and visible beginning of the improvement. Texas relates liens back to the visible commencement of construction or the visible delivery of materials at the construction site.21
This approach gives the lender a clear way to protect itself and a clear way to lose. A lender that records the construction loan mortgage before construction commences protects its mortgage lien against all mechanic's lienors. A lender that fails to do so loses priority to all mechanic's lienors, not just those who worked before the mortgage was recorded.22 Every lienor on the project ranks from the one commencement date, whenever its own work began.
A published illustration shows how a late recording plays out. An owner hires a contractor to clear the land and do the excavation, and the contractor finishes and is paid. Six weeks later the owner obtains a construction loan from a lender that promptly records its mortgage. A second contractor then works on the building, is not paid, and files a lien. That lien relates back to the excavation and takes priority over the mortgage.23 The excavator's payment means no lien rests on the excavation itself, yet the excavation still fixes the date for every later lienor. The lender's prompt recording does not help, because it came six weeks after commencement. Dating the second contractor's lien from its own first day of work would have favored the lender, since that contractor arrived after the recording, and that is the error relation back forecloses.
The lender in that scene wins the first layer because it recorded before commencement and the activity the statute disregards never started the clock. Other states use other approaches to the priority of mechanic's liens, so every analysis begins with what the controlling statute says about the date from which a lien ranks.24
Recording before construction begins does not end the contest, because the loan is funded in stages and each stage can be attacked separately. Even if the mortgage was recorded before work began, a lienor may contend that every construction advance made after its lien attached was optional, not obligatory, and so lost priority to the lien.25 The argument borrows the sorting taught earlier: an obligatory advance carries the mortgage's priority against later encumbrances, and an optional advance exposes the lender to postponement. The lienor's effort therefore goes into placing the later draws in the optional column. This is the lienor's side of the lender's post-default dilemma. When a project falters and the lender keeps funding, the draws the lender might have refused are the ones the lienors attack. A statute that eliminates the obligatory/optional distinction ends the argument for advances within the stated maximum, because each such advance dates from the mortgage.26
In Home Lumber Co. v. Kopfmann Homes, Inc., a bank made a construction loan secured by a mortgage to build a spec home and stopped disbursing after five disbursements. Home Lumber and other businesses that supplied materials or labor filed mechanic's liens. The bank had made three of its disbursements before the liens attached and two after.27 The trial court held the two later disbursements optional and therefore junior to the liens. The Minnesota Supreme Court held them obligatory, so that they kept priority over the liens, because the bank was required to advance the mortgage's full value for the completion and improvement of the property.28
Two features of that reasoning carry over to other cases. First, the construction loan agreement clearly stated the conditions under which the bank was to make additional disbursements, which put the later draws under a commitment and not under the bank's discretion.29 Second, the bank's waiver of one of those conditions, its right to receive lien waivers before disbursing, changed nothing, because a party is free to waive a condition imposed for its own benefit.30 The decision reads a draw's status from the loan documents. A lienor cannot turn a commitment into discretion by pointing to what the bank did after the liens attached. The Schalmo general contractor made the same argument against a lender and lost, because advances conditioned on the borrowers' compliance with certain procedures remain obligatory when the lender has contractually committed to fund the full loan.31 The result runs the other way when the commitment itself leaves the lender a way out. In Kraus-Anderson, the lender's obligation depended on its ability to obtain the necessary funds, and the court concluded the advances were optional.32
The third step ends the analysis for a lender that recorded late, because no classification of advances can repair a rank that relation back has already fixed. The fourth step is where Home Lumber was decided, and it is the only step that depends on how the lender drafted its loan agreement.